SR&ED Tax Cases — Master List

Tax Court of Canada SR&ED judgments, organized by technological eligibility and financial issue, with outcome and significance.

Part I — Technological Eligibility
Appellant / Citation Issue / Industry Outcome Ruling & rationale Implications Analysis of Projects Key Criteria Summaries
I-1 · Software & IT
Acsis EHR
2016 TCC 50
Work to increase stability (Software)✓WinNo existing methodsStill lacks detail on specific hypotheses — ModerateProject 1501Project 1501
CRL Engineering
2019 TCC 65
Distributed computing & advancement (IT)✓WinSequentially progressive complex options via PhD researcher & published scholarly projectExample of software-related advancement — ModerateProject 2003Project 2003
Allegro Wireless
2022
Claims by telecom (Software/AI)✓Win3 of 3 projects eligibleExamples including AI and software — HighOverview
Bluetooth
TCP / cellular
Multi-point platform
Overview
Bluetooth
TCP / cellular
Multi-point platform
Dazzm Inc.
2024 TCC 129
Cloud-based SaaS integration, React performance (Software)✓WinSystemic uncertainty in open-source tool integration (React/Redux); Northwest Hydraulic criteria; beyond routine debugging/optimizationEncourages holistic evaluation of software projects; reinforces documentation via metrics/testimony — HighProject 2501Project 2501
Willowglen Systems Inc.
2026 TCC 7
Industrial control systems: SCADA upgrade vs. SIL 4 train-control box (Software)±SplitMTCLM project allowed: cumulative "system uncertainty" not resolvable by available methods. SCADACOM-5 disallowed ($1,293,692): modernization and scale-up with known tools is product development, not experimental developmentSoftware can win on genuine system-level uncertainty and lose where work is scaling or modernizing — High——
Indusol Industrial Control
2020 TCC 103
Marine control software & system integration (Software)✕LossSome work did no more than identify problems; lack of systematic investigationIdentifying a problem is not SR&ED — ModerateProject 2102Project 2102
National R&D
2020 TCC 47
Dynamic SQL / database software (Software)✕LossHypotheses accepted, but the Court was not convinced on the remaining criteriaHypotheses alone are not enough — ModerateProject 2103Project 2103
I-2 · Manufacturing & Engineering
6379249 Canada Inc.
2015 TCC 77
Printer design problems post commercial sale (Manufacturing)✓WinStrong evidence of technical uncertainty and technological advancementExcellent example of eligible project — High——
Formadrain
2017 TCC 42
Technological advancement, concrete (Engineering)✓WinMethod unique in industry & cross-disciplinaryExcellent example of eligible project — HighProject 1705Project 1705
A&D Precision
2019 TCC 48
Technological advancement in precision machining (Manufacturing)✓WinSystem uncertainty but still lacks detailUse of expert testimony favourable — ModerateHorizontal lathes
Roll grinding
Horizontal lathes
Roll grinding
Beton Mobile
2019 CCI 278
Concrete processes — 5 criteria (Engineering)✓Win6 of 14 projects eligible, each detailedQuestions on why some ineligible — HighWins overview
10-18 mortar
11-07 mortar
12-07 repair
Losses overview
B-10-12
B-11-01
B-12-02
Wins overview
10-18 mortar
11-07 mortar
12-07 repair
Losses overview
B-10-12
B-11-01
B-12-02
Andre Lamy MPC
2020 TCC 61
Whether directly engaged (Engineering)✓WinWork by doctor deemed on behalf of MPC; 4 eligible project examples, 2 with sponsorsClarifies claims for Medical Professional Corporations — HighProject 2101Project 2101
9158 Quebec
2022 TCC 137
Machine design (Engineering)✕LossDocumentation using subcontractorsLow——
Buhler
2023 TCC 18
Tractor design (Manufacturing)✓WinAbility to illustrate integration issuesExcellent illustration of system uncertainties — HighProject 2301Project 2301
Chagnon
2023
Jewelry design (Manufacturing)✕LossBSc. + in field of scienceNeed to evidence knowledge apparent to a BSc. in the field — Low——
Daves Diesel
2023
Injector design (Manufacturing)✕LossBSc. + in field of scienceLowProject 2305Project 2305
JEC
2023
Welding processes (Engineering)✕LossBSc. + in field of scienceLowProject 2306Project 2306
Mold Leaders
2023
Mold designs (Manufacturing)✕LossBSc. + in field of scienceLowProject 2304Project 2304
Mold Leaders (Appeal)
2024
Mold development (Manufacturing)✕LossTrial & error vs. systematic; original ruling supportedLow——
Les Éléments Chauffants Tempora Inc.
2025 TCC 173
Industrial heating elements; statute-barred years; s. 163(2) / s. 160 (Manufacturing)±SplitSome 2007–08 projects allowed (tubular line; flexible silicone/Kapton; annealed tubular & finned elements). 2006 and 2009 claims denied; plagiarized supplier/website text in reports was a misrepresentation that reopened statute-barred yearsCopied technical write-ups can reopen statute-barred years and support penalties — High——
Mac & Mac Hydrodemolition
2017-1942(IT)I · 2017
Pipe-liner removal process for bitumen pipelines (Engineering)✕LossInadequate documentationContemporaneous records are essential — ModerateProject 1801Project 1801
I-3 · Energy & Environment
Northwest Hydraulic Consultants Ltd.
97-531-IT-G · 1998
System uncertainties basis for eligibility (Hydraulics/Environment)✓Win4 of 5 projects eligible on "system uncertainties"Landmark case, "exemplary" project — High——
Rainbow Pipeline
96-4369-IT-G · 1999
Definition of "technological advancement" (Energy/Pipeline)✓WinRejection of a hypothesis is itself an advanceSignificant precedent defining "TA" — High——
Airmax*
2012 TCC 376
Technological advancement, HVAC (Environment)✓WinSystem uncertainties re: heat source pressure ducts; informal appeal procedureHigh——
Novalia (Wind turbines)
2016 TCC 81 · 2017
Wind turbine with patent (Energy)✕LossLack of qualifications — PhD in musicHypotheses must be grounded in science — ModerateProject 1702Project 1702
Airzone One
2022
Air quality research (Environment)✓Win4 of 6 projects eligibleCut-off between eligible and ineligible — HighOverview
Passive monitoring (win)
Combustion (loss)
Passive monitoring (win)
Combustion (loss)
Global Sustainable
2021 TCC 17
Energy efficiency (Energy)✕LossWork deemed routineCompare vs. Airmax case — ModerateProject 2215Project 2215
Logix Data
2022
Solar panels (Energy)✕LossTests not recordedGood project if properly documented — ModerateProject 2216Project 2216
ACBK
2023
Thermal storage process (Energy)✕LossImproving a patented process — planning stageDefining standard practice — ModerateProject 2303Project 2303
Vortex Energy Services Ltd.
2025 TCC 63
Mobile direct-contact water heaters, fracking (Energy)✕LossWork was trial-and-error prototyping; vague/general hypotheses; lack of expert evidenceReinforces need for verifiable systematic documentation — Low——
I-4 · Food & Agri
Flavornet*
2017 TCC 179
Defining standard practice (Food)✕Loss4 of 5 criteria not metDid the TCC consider relevant evidence? — HighProject 1706Project 1706
LifeChoice
2017 TCC 21
SI analysis, formulations by PhD naturopath (Agri/Food)✕LossNo testing of hypothesesChange in interpretation of "testing or analysis" — HighProject 1704Project 1704
Canafric
2023
Food development (Food)✓WinExtension of technologyUnusual verdict based on evidence — ModerateProject 2302Project 2302
Biscuiterie
2024
Food product development (Food)✕LossUsual proceduresDocument hypotheses — Low——
Tuna Temple Inc.
2025 TCC 183
Food processing — 13 projects, 2005–2009 (Food)✕LossNo proven technological uncertainty, no systematic hypothesis testing with records; wages estimated and split evenly across batchesTrial-and-error and reconstructed narratives fail; substantiate wages — High——
Manning Canning Kitchens Inc.
2025
Shelf-stable cold-pressed juice ("Chrisoda") (Food)✓WinNovel HPP application for microbial stability; hypotheses tested via measurable observations (pH, microbial counts)Validates observation & measurement as keys to systematic investigation — HighProject 2502Project 2502
I-5 · Construction & Materials
Les Abeilles (GE)
2014 TCC 313 · 2015
Processes — 4 projects, little evidence (Materials)✓WinVerbal evidence accepted if "highly credible"Credible witnesses counter weak documentation — Moderate——
Atelier Béton
2022
Concrete forming (Construction)✕LossDocumenting hypothesesExamples of variables missing per CRA — ModerateOverview
Modular panels
Concrete floors
Overview
Modular panels
Concrete floors
WRD Borger Construction
2021 TCC 40
Construction✕LossTrial & errorBusiness vs. technological problems — LowProject 2217Project 2217
Paveit Construction Inc.
2025
Roller-compacted concrete field process (Construction)✕LossAdjustments were trial-and-error; known variables; no advancement; poor recordsReinforces need for controlled systematic evidence — Medium——
I-6 · Other (General Processes, etc.)
RIS Christie
[1996] ETC 537
Lack of documentation (General)✕Loss (round 1)No evidence of experimentation or analysisResults and/or a patent are not proof of SI — Moderate——
Hun-Medipharma*
97-2305-IT-I · 1997
Eligibility without "clinical trials" (Pharma)✓WinSR&ED can be "experimentation OR analysis"SI envisions contemplation vs. experimentation — Moderate——
RIS Christie (appeal)
[1999] ETC 2004
Death of key witness (General)✓Win (round 2)Engineer died prior to trial — court sympatheticCourts sympathetic in extreme circumstances — Moderate——
Part II — Financial Issues
Appellant / Citation Issue / Industry Outcome Ruling & rationale Implications
II-1 · Assistance / Grants / Experimental Product Sale
Les Cultures Laflamme
89-2514(IT) · 1989
Sale of experimental production✓WinSale irrelevant if SR&ED was performedSR&ED labour eligible despite subsequent sale — High
Com Dev Ltd.
96-4343-IT-G · 1999
Government fees — "assistance" or "revenue"✓WinFixed-price contract is not a purchase of SR&EDStructure contracts so "taxpayer" bears "risk" — High
CAE
2022
Loans as government assistance✕LossRelated to SR&EDNeed to separate R&D vs. non-R&D loans — Moderate
II-2 · Wages
Synchrosat
2000-1378-IT-I · 1995
Salary to only SR&ED activities✕LossOnly SR&ED percentage claimableNeed to document employee experimentation time — Low
Ergorecherche
[1998] CTC
Time allocation, SR&ED vs. non-SR&ED✕LossReasonable basis for allocation requiredCould structure "non-SR&ED" as unpaid time — Moderate
Alcatel
2005 TCC 149
Stock options — SR&ED "cost" incurred±Win / DrawSR&ED "cost" is dilution of shareholder interest; legislation disallowed > Nov. 14, 2005Courts contemplate "costs" not in taxable income; unavailable after 2005 taxation years — High
Jaft
2015 MBCA 77 · 2016
Wages only payable if SR&ED approved✕LossClaim unpaid wages on Schedule 32, line 315—
AG Shield
2017 TCC 68
Allocation of SR&ED wages✓Win100% allowed even though only 23% attributedDividends & non-T4 payments included? — High
Oldcastle
2016 CCI 183 · 2017
SR&ED wages based on sales✓WinSalary & wages definition, ITA 248(1)Payments not considered commission — High
II-3 · Materials
Consoltex
97 DTC 724 · 1997
Materials used in SR&ED then sold✓WinEligible if required for SR&ED; new legislation requires ITC repayment on saleShort-lived precedent on "commercial materials"; labour eligible, materials sold excluded — High
II-4 · Unpaid Amounts
Chartwell
2004 TCC 728 · 2002
Eligibility of unpaid amounts / bad debts±Win / LossClaim costs in year incurred (then s. 78(4))Opportunity to claim unpaid wages — High
II-5 · Foreign Expenses
LGL
96-4726(IT)G · 1999
Data collection outside Canada, SR&ED?✕Loss / DrawIneligible if physically outside Canada; later eligible within the EEZCourts took a literal interpretation of "in Canada"; prompted the 10% foreign-travel allowance — Moderate
Blackberry Canada
2025
Foreign R&D; whether income is FAPI✓WinR&D services were not FAPIShould not be treated as passive income — High
II-6 · Filing Deadline
Alex Parallel Computers
T-1512-97 · 1998
Basis for extension of filing deadline±Win / DrawMinister's extension power cannot be restricted by CRA; legislation of Nov. 17, 2005 removed SR&ED extensionsExtension reasons per CRA IC (illness/disaster); file by 18 months, preferably 15 — Moderate
Datacalc Research
2000-1413-IT-G · 2000
Extension of 18-month filing deadline✕LossQualified expenditures required by filing due dateObject to proper ITA sections — see Alex Parallel — Low
6379249 Canada Inc.
2015 TCC 77
Proving a project was filed with the claim✓WinVerbal evidence accepted if "highly credible"Not relevant if e-filing claims — Moderate
Easyway Cattle
2015 TCC 211 · 2016
Failed to file Schedule 31✕LossAll prescribed information must be in prescribed formDanger of filing past the 15-month CRA deadline — Moderate
Westsource
2017 TCC 9
Complete claim✕LossProjects only filed by related company18-month deadline is absolute — Moderate
Fooi
2024
Deadline to appeal✕LossFile sent by mail18-month deadline; need proof of filing — High
Windsor
2024
Deadline to appeal✓WinClarification vs. amendmentRight to appeal maintained — Low
II-7 · Qualified CCPC Status
All Colour Chemicals
[1993] CTC
Can CCPC partners claim 35% ITCs?✕LossS. 127(8) partnership rule overrides s. 127(10.1) refundsQualified CCPCs should avoid SR&ED partnerships — High
HSC Research
CTC 2283 (TCC) · 1995
Factors in evaluating de facto control✓WinSeparate directors — no control evidencedLandmark case defining "de facto control" — High
Mimetex Pharmaceutical
1999-4847-IT-G · 1999
Does a US director with 50% shares have control?✕LossUS director acted without consent of a Canadian directorGet consent from at least one of two Canadian directors — High
Terra Remote
2006 TCC 279
Is a <50% shareholder at arm's length?✓WinITA s. 256 (control) & s. 251 (related persons)Specified employee (>10%) vs. "arm's length" — Moderate
Mindready Solutions
2015 CCI 17
Was a private company controlled by a public one?✕LossSeveral factors determine factual controlGood list of relevant issues — Moderate
Aeronautic Dev Corp
2017 TCC 39
De facto control✕LossUndue influence foundBe careful even with <50% of votes — Moderate
CO2 Solution Technologies
2019 CCI 286
Control by a public company✕LossDe facto control establishedLoss with costs — Moderate
II-8 · ITC Use
Ainsworth Lumber
98-1052-IT-G · 2001
ITC use — refundable vs. non-refundable✓WinThe Act clarifies the taxpayer "may" deduct creditsTaxpayer elects the order — Moderate
II-9 · SR&ED Fraud
R v. Elhami
2017 QCCQ 2684
Level of fine✕LossEach of 3 parties charged 50% for false datesFine is 150% of the amount claimed — High
Tempora
SCC 2018
Level of fine✕LossEach of 3 charged 100% for false representationsFine is 300% of the amount claimed — High
II-10 · Reassessment Period
Rio Tinto Alcan
2017 TCC 67
Can CRA reassess 5 years back?✕LossWaivers were filed for other reasonsIncreased risk to all claimants — High
Source: SR&ED cases 1988–2026, compiled from Tax Court of Canada judgments and CRA Redbook data. Rebuilt from archived site records — verify current status of any case before relying on it for a claim.